Leadership

Montana Howell

Chief Operations Officer

Enlink Project Manager & Pipeline Engineer (Estimated Over $4 Billion in Assets)

  • Lobo Gas Gathering System: $190MM – Project Director to manage installing parts of rich gas gathering system and expand the gas processing system from 150MMscfd to 385MMscfd in the Delaware Basin
  • Ascension Pipeline Project: $110MM – Project Director to execute a 33 mile pipeline and pump station to deliver NGL’s to end-user in south Louisiana
  • Lobo Gas Gathering System: $270MM – Conducted the initial development of a 160 miles of rich gas gathering system and gas processing system in the Delaware Basin
  • Ascension Pipeline Project: $110MM – Developed the Front End Engineering and Design for a 33 mile pipeline and pump station to deliver NGL’s to end-user in south Louisiana
  • Oklahoma Express: $396MM – Initial Team Lead to develop 185 miles of rich gas or residue pipeline between the Cana and Bridgeport plants
  • Bearkat Gas Gathering System: $170MM – Initial Team Lead to develop 90 miles of rich gas gathering system between Martin, Howard and Glasscock Counties
  • Cajun Sibon Expansion Phase 2: $126MM – Initial Team Lead to connect multiple gas systems within Louisiana to deliver gas from the north to the river markets and the gas to liquid conversions of 12 inch and 16 inch in the Atchafalaya basin. 
  • Riverside Crude Phase 2: $16.7MM – Team Lead to design and develop the Second Rail Terminal and Barge Loading Facility

Montana holds a B.S. in Mechanical Engineering from Texas Tech University and was previously a District Engineer for Sunoco Logistics MLP.